01Dimensional & Fit Check
Glass · Plastic · Metal Critical dimensions measured against the approved drawing — thread pitch, neck finish, lid fit, wall thickness and stacking height.
Why it matters — a fraction of a millimetre off the neck finish is enough to break a filling line or a child-resistant closure.
Five Inspection Checkpoints- 01Incoming MaterialsRaw materials verified against spec before production begins. Wrong stock is rejected here, not later.
- 02First ArticleFirst finished piece measured against the approved sample. Signed off — or sent back.
- 03Inline InspectionRandom samples pulled during the run, so defects are caught before they multiply.
- 04Pre-Shipment AuditFull inspection of finished goods — seals, CR mechanisms, print quality. Documented with photographs.
- 05Post-Delivery ReviewFollow-up after arrival. Issues logged, resolved, and prevented on the next order.
Every shipment leaves with a QC report — photographs of your actual goods, key measurements and test results. Sent proactively, not on request.